Chiniot Power Limited is setting up a bagasse based cogeneration power plant with a gross capacity of 62.4 MW. This plant consists of two boilers and two turbo-generators. 2x155 TPH high pressure (110 bar) and temperature (540 °C) boilers are being supplied by Wuxi Guolian Huaguang Power Engineering Company Limited, China and 2x31.2 MW extraction condensing type turbo- generators by Hangzhou Steam Turbine Company Limited, China.
Once in operation, this plant would be the most efficient cogeneration power plant in sugar industry of Pakistan, using bagasse (waste of sugar plant) as fuel to generate electrical power with low cost. The plant is environmental friendly, as there would be negligible emissions from its chimney as smoke is controlled by using electro static precipitators.
Project Capacity | 62.4MW (Gross) |
---|---|
Power Purchaser | NTDC through CPPA |
Consultants | Avant Garde India |
Steam Turbines | 2 x 31.2 MW condensing and extraction, manufactured by HTC China |
Boilers | 2 x 155 tons per hour 110 bar & 535°C high pressure/temperature travelling grate boilers, Manufactured by Wuxi China |